Reconstruction of a wastewater treatment system in the automobile industry

Reconstruction of a wastewater treatment system in the automobile industry The central water treatment system of a automotive factory had to be renewed and upgraded to the current state of the art. The key components of the plant were: chromate decontamination, emulsion separation, coagulation, pre-neutralisation, neutralisation, flocculation, sedimentation by a lamella separator and a final PH-value determination system. Furthermore, the required storage and buffer tanks and batchers were still existent. The outdated lamella separator had to be renewed and a gravel filter plant was added.

Initially it was plant to reconstruct the plant during the winter holidays, as many different extensive procedures were to be performed. Just to name a few: modifications of the steel constructions, dismantling and assembly of peripheral plants and removal of the lamella clarifier with a heavy lifting device.

Due to exact operation scheduling already in the preliminary planning stage, Leiblein GmbH was able to perform the reconstruction on a single weekend, which meant less effort and costs for the car factory.

Autumn 2002 the reconstruction was then completed within only one weekend.

Leiblein lamella clarifier – an ideal solution!

Further articles

Back to overview

Contact us

Please contact us for
further information.

Pilot Plants

Customer-specific pilot
plants for testing purposes.